1. Analysis of a loss of residual heat removal system during mid-loop conditions at PKL facility using RELAP5/Mod3. 3;Carlos;Nucl. Eng. Des.,2008
2. Final Safety Analysis Report (FSAR) of Ling'ao Nuclear Power Plant;CGN,2008
3. RELAP5/MOD3 analysis of a ROSA-IV/LSTF loss-of-RHR experiment with a 5% cold leg break;Choi;Ann. Nucl. Energy,1997
4. Commission, N.R. 1987. Loss of residual heat removal system: Diablo Canyon, Unit 2, April 10, 1987.: Nuclear Regulatory Commission.
5. Commission, N.R. 1990. Loss of vital ac power and the residual heat removal system during mid-loop operations at Vogtle Unit 1 on March 20, 1990. Nuclear Regulatory Commission.