1. Anderson, R., 2011. St. Lucie, Unit 1 – Information Regarding Steam Generator Tube Rupture Steam Release and Margin to Overfill Provided in Support of the Extended Power Uprate License Amendment Request, Letter, ML112311262.
2. Bochman, W.D., 1992. STGR Scenarios Utilizing Operator Crews and EOPs on Plant Simulator (In support of WCAP-10698 Methodology to Resolve Licensing Condition No. 41 of the WBN Draft License), Technical report, TVA.
3. Borton, K., 2011a. MUR Technical Evaluation, (Non-Proprietary Version), Attachment 7 to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (MUR) Power Uprate., Technical report, Braiwood Byron Stations, ML111790042.
4. Borton, K., 2011b. Steam Generator Tube Rupture Analysis Report, Attachment 5a to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (MUR) Power Uprate., Technical report, Exelon, ML111790038.
5. Bye, A., Lois, E., Dang, V., 2011. International HRA Empirical Study – Phase 2 Report. Results from Comparing HRA Method Predictions to Simulator Data from SGTR Scenarios (NUREG-IA-216-Vol.2), Technical report, OECD HALDEN REACTOR PROJECT, ML100890142.