1. S. Amato et al., LHCb technical proposal, CERN/LHCC 98-4, 1998.
2. J.-P. Dufey et al., The LHCb trigger and data acquisition system, 11th IEEE NPSS real time conference (RT’99), Santa Fe, NM, USA, June 14–18 1999.
3. M. Ashton et al., Status report on the RD-12 project. Timing, Trigger and Control Systems for LHC Detectors, CERN/LHCC 2000-002, LEB Status Report/RD12, 3 January 2000.
4. Y. Ermoline, Vertex detector electronics – timing and synchronization Issues, LHCb note TRAC 98-052, 26 June 1998.
5. H. Dijkstra, LHCb FE reset scenarios and their consequences, LHCb note FE 2000-021, 16 March 2000.