1. EPRI NP-5743, 1988. Loose Part Monitoring System, EPRI Report, March.
2. O. Vacheron, L. Cai, J.C. Benas, 1995. Transient characterization by means of nonlinear optimization for loose part monitoring: improvement of the signal-to-noise ratio by noise spectrum subtraction. Progress in Nuclear Energy, 10.3.
3. B. Bechtold, W. Knoblach, U. Kunze, 1995. The new loose parts monitoring system KÜS‘95’. Progress in Nuclear Energy, 10.7.
4. C.W. Mayo et al., 1988. Loose-parts monitoring system improvements. EPRI NP-5743, Final report, March.
5. ABB-CE. Technology Transfer and Training CRT-4 Manual for Nuclear Integrity Monitoring System (NIMS) presented to KAERI.