1. Detour Lake Mine–NI 43-101 Technical Report;Allaire,2014
2. Evolution of the southern Abitibi greenstone belt based on U-Pb geochronology: autochtonous volcanic construction followed by plutonism, regional deformation, and sedimentation;Ayer;Precambrian Research,2002
3. Overview of results from the greenstone architecture project: discover abitibi initiative;Ayer,2005
4. Project Unit 95-024. A stratigraphic and metallogenic comparison of the Detour–Burntbush Area with the southern Abitibi greenstone belt and its implications for exploration;Ayer,2009
5. Tectonic and metallogenic evolution of the Abitibi and Wawa sub-provinces;Ayer,2010