1. Ackermann, T., 2004. Distributed resources in a re-regulated market environment. Doctoral Thesis, The Royal Institute of Technology, Stockholm.
2. Auer, H., Stadler, M., Resch, G., Huber, C., Schuster, T., Taus, H., Nielsen, L.H., Twidell, J., Swider, D.J., 2004. Cost and technical constraints of RES-E grid integration. Deliverable 2 of the EU-project GreenNet (“Pushing a least cost integration of green electricity into the European grid”), Vienna.
3. Economics of large scale intermittent RES-E integration into the European grids: analyses based on the simulation software GreenNet;Auer;International Journal of Global Energy Issues,2006
4. Regional electricity price differences due to intermittent wind power in Germany: impact of extended transmission and storage capacities;Barth;International Journal of Global Energy Issues,2006
5. Barth, R., Brand, H., Meibom, P., Weber, C., 2006b. A stochastic unit-commitment model for the evaluation of the impacts of integration of large amounts of intermittent wind power. In: Proceedings of the Ninth International Conference on Probabilistic Methods Applied to Power Systems, Stockholm.