1. ABB (2007), Press release, available on: 〈http://www.abb.com/cawp/seitp202/027233183b748a02c12572e30042d031.aspx〉
2. Amprion, EnBW TNG, transpower, VE-T (2009). Regionenmodell 2013, available on 〈http://www.amprion.net/kraftwerke〉
3. Calculation of economic transmission connection capacity for wind power generation;Ault;IET Renewable Power Generation,2007
4. Agency for the Cooperation of Energy Regulators (ACER). Framework Guidelines on Capacity Allocation and Congestion Management for Electricity, FG-2011-E-002, 29 July 2011
5. Europe plans a North Sea grid;Blau;Spectrum, IEEE,2010