Author:
Ameen Wadea,AlKahtani Mohammed,Mohammed Muneer Khan,Abdulhameed Osama,El-Tamimi Abdulaziz Mohammed
Funder
Raytheon Chair for Systems Engineering
Reference19 articles.
1. Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines;Alexandros;Eur. J. Oper. Res.,2008
2. Analysis of a multicriterial buffer capacity optimization problem for a production line”;Dolgui;Automat. Remote Control,2017
3. El-tamimi, A., Savsar, M., 1987. The availability of a two-stage production line with intermediate buffer. IASTED Reliability and Quality Control Conference, 24–26 June, Paris, France, pp. 117–120.
4. Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance;Fitouhi;Reliab. Eng. Syst. Saf.,2017
5. Stochastic modelling of a two-stage transfer-line production system with end buffer and random demand;Gopalan;Microelectron. Reliab.,1992
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献