1. How to prepare a power system for 12% wind energy penetration: the Portuguese case study;Estanqueiro,2006
2. Royal Decree 436/2004, Establishing the Methodology to Update and Organize the Legal and Economic Procedures for Electricity Generation Belonging to the Special Regime, March 12, 2004 [Online]. Available: http://www.cne.es.
3. Automatic generation control of a wind farm with variable speed wind turbines;Rodriguez-Amenedo;IEEE Trans. Energy Convers.,2002
4. Steady state power system issues when planning large wind farms;Wiik,2002
5. Reactive power control of a wind farm made up with doubly fed induction generators (I and II);Tapia,2001