1. European network of transmission system operators of electricity [On-line], https://www.entsoe.eu/Pages/default.aspx.
2. ENTSO-E, “Making non-mandatory requirements at European level mandatory at national level ENTSO-E guidance document for national”, [On-line], https://electricity.network-codes.eu/network_codes/cnc/cnc-igds/, 2016.
3. Prescription for interoperability: power system challenges and requirements for interoperable solutions;Ivanov;IEEE Power Energy Mag.,2016
4. CEN-CENELEC-ETSI Smart Grid Coordination Group. “Smart grid reference architecture”. November 2012. [On-line] Available: http://ec.europa.eu/energy/gas_electricity/smartgrids/doc/xpert_group1_reference_architecture.pdf.
5. EnergyNet.dk, “Technical regulations 3.2.2. for pv power plants above 11KW”, July 2016, Revision 4 [On-line], Available: https://en.energinet.dk/Electricity/Rules-and-Regulations/Regulations-for-grid-connection.