1. The shifting bottleneck procedure for job-shop scheduling;Adams;Management Science,1988
2. Brucker, P., Jurisch, B., and Sievers, B., “A branch and bound algorithm for the job-shop scheduling problem”, to appear in Discrete Mathematics.
3. Industrial Scheduling;Muth,1963