Author:
Quadt Daniel,Kuhn Heinrich
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference67 articles.
1. Acero-Domínguez, M.J., Paternina-Arboleda, C.D., 2004. Scheduling jobs on a k-stage flexible flow shop using a TOC-based bottleneck procedure. In: Jones, M.H., Patek, S.D., Tawney, B.E. (Eds.), Proceedings of the 2004 Systems and Information Engineering Design Symposium, pp. 295–298.
2. The shifting bottleneck procedure for job shop scheduling;Adams;Management Science,1988
3. BPSS: A scheduling support system for the packaging industry;Adler;Operations Research,1993
4. Scheduling of flexible flow lines in an automobile assembly plant;Agnetis;European Journal of Operational Research,1997
5. A flexible flowshop problem with total flow time minimization;Azizoglu;European Journal of Operational Research,2001
Cited by
76 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献