1. A heuristic methodology for order distribution in a demand driven collaborative supply chain;Chan;International Journal of Production Research,2004
2. Optimizing the schedule of dispatching RMC trucks through genetic algorithms;Feng;Automation in Construction,2004
3. Garcia, J.M., Lozano, S., Smith, K., Kwok, T., Villa, G., 2002. Coordinated scheduling of production and delivery from multiple plants and with time windows using genetic algorithms. In: Proceedings of the 9th International Conference on Neural Information Processing, ICONIP’02, vol. 3, pp. 1153–1158.
4. Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling;Ishibuchi;IEEE Transactions on Evolutionary Computation,2003
5. A computerized causal forecasting system using genetic algorithms in supply chain management;Jeong;Journal of Systems and Software,2002