1. The shifting bottleneck procedure for job shop scheduling;Adams;Management Science,1988
2. Integrated Scheduling of material handling and manufacturing activities for just in time production of complex assemblies;Anwar;International Journal of Production Research,1998
3. Anwar, M.F., Nagi, R., 1997. Integrated conflict free routing of AGVs and workcenter scheduling in a just in time production environment. In: Proceedings of the 1997 6th Annual Industrial Engineering Research Conference, May 17–18, Miami, FL, USA.
4. Constraint-Based Scheduling—Applying Constraint Programming to Scheduling Problems;Baptiste,2001
5. Beasley, J.E. OR-Library test problems. Available from: .