1. Introduction to Sequencing and Scheduling;Baker,1974
2. Minimizing makespan on a two-machine re-entrant flowshop;Choi;Journal of the Operational Research Society,2007
3. Minimizing makespan on an m-machine re-entrant flowshop;Choi;Computers and Operations Research,2008
4. Choi, S.-W., Kim, Y.-D., 2008b. Proofs of propositions for a two-machine re-entrant flowshop scheduling problem. Technical Report 2008-07, Department of Industrial Engineering, Korea Advanced Institute of Science and Technology, Yusong-gu, Daejon, Korea.
5. Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop;Choi;International Journal of Production Research,2005