Author:
Wang Qiang,Wang Shaoming,Liu Huan,Shen Jiaying,Shang Fengju,Shi Congling,Tang Fei
Funder
National Key R&D Program of China
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference40 articles.
1. Calculation of response time of ceiling-mounted fire detectors;Alpert;Fire Technol.,1972
2. Chen, M.Y., 2013. Study on fire risk assessment and control of subway based on the fuzzy theory. PhD thesis. Hua Qiao University, China.
3. Studies on tunnel fire ceiling jet characteristic with longitudinal ventilation and ceiling smoke extraction;Chen,2016
4. Flame interaction and burning characteristics of abreast liquid fuel fires with cross wind;Fan;Exp Therm Fluid Sci,2017
5. Experimental studies on the gas temperature and smoke back-layering length of fires in a shallow urban road tunnel with large cross-sectional vertical shafts;Guo;Tunn. Undergr. Sp. Technol.,2019
Cited by
55 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献