1. Design a new intelligence expert decision making using game theory and fuzzy AHP to risk management in design, construction, and operation of tunnel projects (case studies: Resalat tunnel);Aliahmadi;The International Journal of Advanced Manufacturing Technology,2011
2. Modeling tunnel boring machine performance by neuro-fuzzy methods;Alvarez Grima;Tunnelling and Underground Space Technology,2000
3. Underground construction in the Czech Republic;Barták,2007
4. Barták, J., Makásek, P., 2011. Stability time of the unsupported tunnel excavation. In: Presented at the 39. konference zakládání staveb, Brno, pp. 162–168.
5. Modelling TBM performance with artificial neural networks;Benardos;Tunnelling and Underground Space Technology,2004