1. Andrusiewicz, M., Brennan, M., Evans, C., Morrison, R., Perkins, T. Wightman, E., 2011. Multi-component Modelling and Simulation. AMIRA P9O Final Technical Report.
2. Bruce, R., Mayhew K., Mean, R., Kadereit, H., Nagy, A., Wagner, O. 2014. Unlocking Value in Copper Arsenic Sulphide Resources with the Copper–Arsenic CESL Technology. (accessed 5 March 2014).
3. Sampling a mineral deposit for metallurgical testing and the design of comminution and mineral separation processes;Hanks,2002
4. Haque, N., Bruckard, W., Cuevas, J., 2012. A techno-economic comparisons of pyrometallurgical and hydrometallurgical options for treating high-arsenic copper concentrates. In: XXVI International Mineral Processing Congress, New Delhi, India
5. Hoal, K., Woodhead, J., Smith, K.S., 2013. The importance of mineralogical input into geometallurgy programs. In: Dominy, D.S. (Ed.), The Second AUSIMM International Geometallurgy Conference, Brisbane, Australia.