Author:
Pamparana G.,Kracht W.,Haas J.,Ortiz J.M.,Nowak W.,Palma-Behnke R.
Funder
Chilean National Commission for Scientific and Technological Research
Solar Mining project
German Academic Exchange Service
German Research Foundation
Natural Sciences and Engineering Research Council of Canada
Subject
Mechanical Engineering,Geotechnical Engineering and Engineering Geology,General Chemistry,Control and Systems Engineering
Reference38 articles.
1. A novel approach to the geometallurgical modelling of the Collahuasi grinding circuit;Alruiz;Min. Eng.,2009
2. The effects of ore variability on HPGR trade-off economics;Amelunxen;Int. Autogen. Semiautogen. Grind. Technol.,2011
3. Optimal hoist scheduling of a deep level mine twin rock winder system for demand side management;Badenhorst;Electric Power Syst. Res.,2011
4. Bergholz, W.S., Schreder, M., 2003. Escondida—Phase IV grinding circuit. In: 36th. Annual Meeting. The Canadian Institute of Mining, Metallurgy and Petroleum.
5. Geometallurgical modeling at Olympic dam mine, South Australia;Boisvert;Math. Geosci.,2013
Cited by
18 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献