1. Breiman, L., Friedman, J., Olshen, R. and Stone, C. J., Classification and Regression Trees. Wadsworth, Belmont, CA, 1984
2. A simulation analysis of the Japanese just-in-time technique (with Kanbans) for a multi-line, multi-stage production system;Huang;Decision Science,1983
3. The determination of the optimal number of kanbans in a just-in-time production system;Fukukawa;Computers and Industrial Engineering,1993
4. A review of optimization models of Kanban-based production systems;Price;European Journal of Operational Research,1994
5. Monden, Y., Toyota Production System. Industrial Engineering and Management Press, Norcross, GA, 1983