1. Experimental determination of interfacial friction factor in horizontal drilling with a bed of cuttings;Martins,1996
2. Reducing the risk of stuck pipe in the Netherlands;Hopkins,1995
3. Amocos training initiative reduces wellsite drilling problems;Massie;Pet. Eng. Int.,1995
4. Extended-Reach Drilling -- What is the Limit? SPE Annual Technical Conference and Exhibition;Mason,1998
5. Experimental study of cuttings transport in directional wells;Tomren;SPE Drill. Eng.,1986