Author:
Verstichel Jannes,De Causmaecker Patrick,Spieksma Frits,Vanden Berghe Greet
Subject
Transportation,Business and International Management,Civil and Structural Engineering
Reference17 articles.
1. Early/tardy scheduling with sequence dependent setups on uniform parallel machines;Balakrishnan;Comput. Oper. Res.,1999
2. The integrated yard truck and yard crane scheduling problem: Benders decomposition-based methods;Cao;Transport. Res. Part E: Logist. Transport. Rev.,2010
3. Integrating berth allocation and quay crane assignments;Chang;Transport. Res. Part E: Logist. Transport. Rev.,2010
4. A combinatorial benders cuts algorithm for the quayside operation problem at container terminals;Chen;Transport. Res. Part E: Logist. Transport. Rev.,2012
5. Coene, S., Spieksma, F., Vanden Berghe, G., 2011. The Lockmaster’s Problem. Technical Report KBI-1126. KU Leuven. Available at: https://lirias.kuleuven.be/handle/123456789/318524.
Cited by
51 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献