1. Albrecht, A., 2009. Integrating railway track maintenance and train timetables. Ph.D. thesis. University of South Australia. Adelaide. URL: http://itupl-ura1.ml.unisa.edu.au/R/?func=dbin-jump-full&object_id=unisa37507.
2. Albrecht, A.R., Panton, D.M., Lee, D.H., 2013. Rescheduling rail networks with maintenance disruptions using problem space search. Computers & Operations Research 40, 703-712. doi:10.1016/j.cor.2010.09.001.
3. Andrade, A., Teixeira, P., 2011. Biobjective optimization model for maintenance and renewal decisions related to rail track geometry. Transportation Research Record: Journal of the Transportation Research Board 2261, 163-170. doi:10.3141/2261-19.
4. Andrade, A.R., Teixeira, P.F., 2012. A bayesian model to assess rail track geometry degradation through its life-cycle. Research in Transportation Economics 36, 1-8. doi:10.1016/j.retrec.2012.03.011.
5. Antoni, M., 2009. The ageing of signalling equipment and the impact on maintenance strategy, in: International Conference on Computers Industrial Engineering, 2009. CIE 2009, pp. 1179-1184. doi:10.1109/ICCIE.2009.5223965.