1. Human energy expenditure in order picking storage assignment: A bi-objective method;Battini;Computers & Industrial Engineering,2016
2. Solving hard multiobjective optimization problems using ϵ-constraint with cultured differential evolution, in: Parallel Problem Solving from Nature-PPSN IX;Becerra,2006
3. Ageing workforce effects in Dual-Resource Constrained job-shop scheduling;Berti;International Journal of Production Economics,2021
4. Bestuzheva, K., Besançon, M., Chen, W.K., Chmiela, A., Donkiewicz, T., Van Doornmalen, J., Eifler, L., Gaul, O., Gamrath, G., Gleixner, A., Gottwald, L., Graczyk, C., Halbig, K., Hoen, A., Hojny, C., Van Der Hulst, R., Koch, T., Lübbecke, M., Maher, S.J., Matter, F., Mühmer, E., Müller, B., Pfetsch, M.E., Rehfeldt, D., Schlein, S., Schlösser, F., Serrano, F., Shinano, Y., Sofranac, B., Turner, M., Vigerske, S., Wegscheider, F., Wellner, P., Weninger, D., Witzig, J., 2021. The SCIP Optimization Suite 8.0.
5. A model for rest allowance estimation to improve tasks assignment to operators;Calzavara;International Journal of Production Research,2019