1. U.S. Nuclear Regulatory Commission, Seismic Qualification of Equipment in Operating Plants, Status Report, Unresolved Safety Issue A-46, NUREG 1018.
2. U.S. Nuclear Regulatory Commission, Seismic Qualification of Equipment in Operating Plants, Status Report, Unresolved Safety Issue A-46, NUREG 1030.
3. Shaking-Table Testing for Seismic Evaluation of electrical Raceway Systems;URS/John A. Blume & Associates, Engineers,1983
4. Development of Analysis and Design Techniques from Dynamic Testing of Electrical Raceway Support Systems;Reimer,1979