1. The generic implementation procedure (GIP) for seismic verification of nuclear plant equipment;MPR Associates, Inc.,1988
2. Verification of seismic adequacy of mechanical and electrical equipment in operating reactors Unresolved Safety Issue (USI) A-46;U.S. Nuclear Regulator Commission;A-46 Generic Letter 87-02,1988
3. Evaluation of cable tray and conduit systems using the seismic experience data base;Eder;Nucl. Engrg. Des.,1988
4. Cable tray and conduit system seismic evaluation guidelines;Eder,1988
5. A comparison of cable trays at the Seabrook Nuclear Station with the seismic experience data base;Horstman,1985