1. A binary borg-based heuristic method for solving a multi-objective lock and transshipment co-scheduling problem;Ji;IEEE T. Intell. Transp.,2019
2. Three Gorges Navigation Administration (2019). Three Gorges-Gezhouba Vessel Passing Plan. [Online]. Available: https://www.sxthj. com.cn/sys/news/?categoryId=15e563776972ac4d9891c334dd2b97e3.
3. J.L. Qi, Y. Zhang, Z.J. Liu, X. Ran, Y. Tang, S. Cheng, R. Ran, A scheduling method for a group of ships waiting to pass the lock within approach channel, 2020, China, CN111424626A.
4. A comparative methodological approach for the calculation of ships air emissions and fuel-energy consumption in two major Greek ports;Doundoulakis;Marit. Policy Manage.,2021
5. Neural network-based fuel consumption estimation for container ships in Korea;Le;Marit. Policy Manage.,2020