1. A two-step heuristic to build flight and maintenance planning in a rolling-horizon;Afsar,2006
2. Decreasing airline delay propagation by re-allocating scheduled slack;AhmadBeygi;IIE Trans.,2010
3. A model and optimization-based heuristic for the operational aircraft maintenance routing problem;Al-Thani;Transport. Res. Part C: Emerg. Technol.,2016
4. A model for enhancing robustness of aircraft and passenger connections;Aloulou;Transport. Res. Part C: Emerg. Technol.,2013
5. Ball, M., Barnhart, C., Dresner, M., Hansen, M., Neels, K., Odoni, A., Peterson, E., Sherry, L., Trani, A.A., Zou, B., 2010. Total Delay Impact Study: A Comprehensive Assessment of the Costs and Impacts of Flight Delay in the United States. National Center of Excellence for Aviation Operations Research (NEXTOR).