Author:
Ribas Imma,Companys Ramon,Tort-Martorell Xavier
Subject
Artificial Intelligence,Computer Science Applications,General Engineering
Reference42 articles.
1. A Heuristic to Minimize Makespan in Proportional Parallel Flow Shops;Al-Salem;International Journal of Computing & Information Sciences,2004
2. The third comprehensive survey on scheduling problems with setup times/costs;Allahverdi;European Journal of Operational Research,2015
3. On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time;Aqil;Annals of Operations Research,2021
4. Parallel flowshop scheduling using Tabu search;Cao;International Journal of Production Research,2003
5. Costa, A., Cappadonna, F. V., & Fichera, S. (2020). Minimizing makespan in a Flow Shop Sequence Dependent Group Scheduling problem with blocking constraint. Engineering Applications of Artificial Intelligence, 89(December 2019), 103413. https://doi.org/10.1016/j.engappai.2019.103413.
Cited by
29 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献