1. Aler, R., & Borrajo, D. (2002). Learning single-criteria control knowledge for multi-criteria planning. In Proceedings of the AIPS-02 workshop on planning and scheduling with multiple criteria (pp. 35–40).
2. A knowledge-based approach for business process reengineering, SHAMASH;Aler;Knowledge Based Systems,2002
3. Towards a general theory of action and time;Allen;Artificial Intelligence,1984
4. Computational aspects of reordering plans;Bäckström;Journal of Artificial Intelligence Research,1998
5. Berry, P. M., & Drabble, B. (2000). SWIM: an AI-based system for organizational management. In Proceedings of the 2nd NASA international workshop on planning and scheduling for space, San Francisco, California.