1. D.N. French, Short-term high temperature failures, National Board Bulletin, 1991, April.
2. Failure investigation of a secondary super heater tube in a 140 MW thermal power plant;Saha;Case Stud. Eng. Fail. Anal.,2017
3. Root cause failure analysis of a division wall superheater tube of a coal-fired power station;Rahman;Eng. Fail. Anal.,2010
4. Root cause failure analysis of superheated steam tube at a petrochemical plant;Hosseini;Procedia Struct. Integr.,2018
5. S. Chaudhuri, R. Singh, High temperature boiler tube failures: case studies, in: Proceedings of Clinic on Fail (COFA), ©NML Jamshedpur, India, 1997.