1. Scheduling no-wait robotic cells with two and three machines;Agnetis;European J. Oper. Res,2000
2. N. Brauner, G. Finke, Final results on the one-cycle conjecture in robotic cells, Internal note, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France, 1997.
3. Production Management Systems;Browne,1996
4. Cyclic scheduling in robotic flowshops;Crama;Ann. Oper. Res,2000
5. Cyclic scheduling of identical parts in a robotic cell;Crama;Oper. Res,1997