1. Repair of a displaced shield tunnel of the Taipei Rapid Transit System;Chang;Tunnelling Underground Space Technol.,2001
2. The assessment of limits for the movement of subway tunnels and trackwork due to adjacent construction;Doran,2000
3. Inspection maintenance and repair of tunnels: international lessons and practice;Richards;Tunnelling Underground Space Technol.,1998
4. Planning the monitoring required to confirm the movement and rotation of tunnels and trackwork due to excavation and tunneling;Shirlaw,2000
5. Sinotech, 1999. Effects of Adjacent Construction to Existing TRTS Tunnel. Report submitted to the Department of Rapid Transit Systems, October, 1999 (in Chinese).