1. Theory and technology of top coal caving mining;Zhong,2001
2. Longwall mining;Peng,1983
3. Cai Y, Hebblewhite BK, Onder U, Xu B, Kelly M, Wright B, Kraemer M. Application of longwall top coal caving to Australian operations. CSIRO-ACARP report C11040; 2003.
4. Poulsen BA. Evaluation of software code UDEC for modelling top coal caving in an Australian environment. CSIRO exploration and mining report 1115F; 2003.
5. Three dimensional numerical analysis of deformation and failure during top coal caving;Xie;Int J Rock Mech Min Sci,1999