Author:
Zima Wiesław,Grądziel Sławomir,Cebula Artur,Rerak Monika,Kozak-Jagieła Ewa
Funder
Narodowe Centrum Badań i Rozwoju
EEA Grants and Norway Grants
Reference33 articles.
1. E. Delarue, J. Morris, Renewables Intermittency: Operational Limits and Implications for Long-Term Energy System Models, MIT Joint Program on the Science and Policy of Global Change, Report No. 277, Cambridge, MA, 2015.
2. Flexibility and efficiency co-enhancement of thermal power plant by control strategy improvement considering time varying and detailed boiler heat storage characteristics;Wang;Energy,2021
3. Application of fast adaptive moth-flame optimization in flexible operation modeling for supercritical unit;Hou;Energy,2022
4. Simulation of rapid increase in the steam mass flow rate at a supercritical power boiler outlet;Zima;Energy,2019
5. Mathematical model of a supercritical power boiler for simulating rapid changes in boiler thermal loading;Taler;Energy,2019
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献