1. The Third Comprehensive Survey on Scheduling Problems with Setup Times/costs;Allahverdi;European Journal of Operational Research,2015
2. Cyber-Physical Systems Architecture for Self-Aware Machines in Industry 4 . 0 Environment;Bagheri;IFAC-PapersOnLine,2015
3. Self-Organized Holonic Multi-Agent Manufacturing System: The Behavioural Perspective, in: Systems, Man, and Cybernetics (SMC), 2013 IEEE International Conference on, (pp. 3829–3834);Barbosa,2013
4. Bouazza, W., Aissani, N. & Beldjilali, B. (2014). PLM through Intelligent Products Quality Control in the Pharmaceutical Industry.
5. A Model for Manufacturing Scheduling Optimization through Learning Intelligent Products;Bouazza,2015