1. Ben Ammar O., Hnaien F., Marian H., Dolgui A. (2014). Optimization approaches for multi-level assembly systems under stochastic lead times. Chapter in Metaheuristics for production systems, L. Amodeo, E-G. Talbi, F. Yalaoui (Eds), Springer.
2. Ben Ammar O., Marian H., Wu D., Dolgui A. (2013a). Mathematical Model for Supply Planning of Multi-level Assembly Systems with Stochastic Lead Times. Proceedings of the IFAC Conference on Manufacturing Modelling, Management and Control (MIM’2013) 7th IFAC Conference on Manufacturing Modelling, Management, and Control, Russia.
3. Ben Ammar O., Marian H., Dolgui A. (2013b). Optimization for supply planning in multilevel assembly systems with stochastic lead times. 5th International Conference on Industrial Engineering and System Management (IESM’13). Rabat (Morocco), October 28-30, 2013, 10 pages.
4. Fuzzy goal programming for material requirements planning under uncertainty and integrity conditions;Díaz-Madroñero;International Journal of Production Research,2014
5. Paramétrage de la méthode MRP en environnement incertain: une revue de la littérature;Damand;Revue Française de Gestion Industrielle,2011