1. Solution of real-world train timetabling problems;Caprara;Proceedings of the 34th Annual Hawaii International Conference,2001
2. A fast heuristic for the train scheduling problem;Cai;Computers and Operations Research,1994
3. A new aircrew-scheduling model for short haul routes;Chang;Journal of Air Transport Management,2002
4. Hybrid applications of constraint satisfaction and meta-heuristics to railway timetabling: a comparative study;Isaai;IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews,2001
5. K. Nachtigall, Periodic network optimization and fixed interval timetables, Habilitationsschrift, Universität Hildesheim, 1998.