Author:
Liu Qihao,Wang Cuiyu,Li Xinyu,Gao Liang
Subject
Electrical and Electronic Engineering,Artificial Intelligence,Control and Systems Engineering
Reference53 articles.
1. A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines;Abedi;Expert Syst. Appl.,2020
2. Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm;Ausaf Muhammad;Front. Mech. Eng.,2015
3. A low-carbon future for China's tech industry;Barquin;Science,2022
4. Dynamic shuffled frog-leaping algorithm for distributed hybrid flow shop scheduling with multiprocessor tasks;Cai;Eng. Appl. Artif. Intell.,2020
5. A multi-population particle swarm optimization algorithm with random network for solving multi-resource constrained flexible job shop scheduling problems;Cui;J. Chongqing Univ. Nat.Sci.Ed.,2022
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献