1. Ventilation control system implementation and energy consumption reduction at Totten Mine with Level 4 Tagging and future plans;Acuña,2017
2. Ventilation control system implementation and energy consumption reduction at Totten Mine with Level 4 Tagging and future plans;Acuña,2017
3. A review of primary mine ventilation system optimization;Acuña;Interfaces,2014
4. Updated Ventilation on Demand review: implementation and savings achieved;Acuña,2016
5. Updated Ventilation on Demand review: implementation and savings achieved;Acuña,2016