1. A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull;Baker;Journal of Manufacturing Systems,1998
2. Hierarchy in distributed shop floor control;Bongaerts;Computers in Industry,2000
3. Bousbia, S., Trentesaux, D., 2002. Self-organization in distributed manufacturing control: state-of-the-art and future trends. In: Proceedings of the IEEE SMC’02, Tunisia.
4. Bousbia, S., Anli, A., Trentesaux, D., Grislin, E., 2005. Agile scheduling of flexible manufacturing systems of production. In: Seventeenth International Association for Mathematics and Computer in Simulation World Congress – IMACS 05, Paris.
5. Bussmann, S., Schild, K., 2001. An agent-based approach to the control of flexible production systems. In: Eighth IEEE International Conference on Emerging Technologies and Factory Automation, vol. 2. pp. 481–488.