1. F.T.S. Chan, N.K.H. Tang, Performance of Push, Pull, and Hybrid scheduling system in a flow shop manufacturing environment, in: Proceedings of the International Symposium on Advanced Manufacturing Processes Systems and Technologies (AMPST), University of Bradford, UK, March 1996, pp. 27–36.
2. Explores the scheduling problems in a flow shop environment via simulation;Chan;Int. J. Mater. Prod. Technol.,1996
3. Overview of kanban systems;Huang;Int. J. Comput. Integrated Manuf.,1996
4. A kanban-based simulation study of a mixed model just-in-time manufacturing line;Yavuz;Int. J. Prod. Res.,1995
5. Overplanning factor in Toyota’s formula for computing the number of kanban;Co;IIE Trans.,1997