1. Ohno, Taiichi, 1986, Toyota Production System: Beyond Large Scale Production. NY Productivity Press.
2. Hopp and Spearman, 2002. Factory physics, McGraw Hill.
3. Gershwin, S., 2004, Time variability in manufacturing systems, Course Notes, Massachusetts Institute of Technology.
4. Miltenburg, G., 1987, Variance of the Number of Units Produced on a Transfer Line with Buffer Inventories during a Period of Length T, Naval Research Logistics, 34, p. 811.
5. Hendrics, K., 1992, The Output Process of Serial Production Lines of Exponential Machines with Finite Buffers, Operations Research, 40, p.1139.