1. Marian, R., Kargas, A., Luong, L.H. S., Abhary, K., 2003. A framework to planning robotic flexible assembly cells, 32nd International Conference on Computers and Industrial Engineering, Limerick, Ireland, p. 607-615.
2. Abd, K., Abhary, K., Marian, R., 2010. A scheduling framework for robotic flexible assembly cells, the 10th Global Congress on Manufacturing and Management, Bangkok, Thailand, p. 111-116.
3. Mohamed, S.B., Petty, D.J., Harrison, D.K., Rigby, R., 2001. A cell management system to support robotic assembly, the International Journal of Advanced Manufacturing Technology 19, p. 598-604.
4. Nof, S.Y., Chen, J., 2003. Assembly and disassembly: an overview and framework for cooperation requirement planning with conflict resolution, Journal of Intelligent and Robotic Systems 37, p. 307-320.
5. Lee, J.K., Lee, T.E., 2002. Automata-based supervisory control logic design for a multi-robot assembly cell, International Journal Computer Integrated Manufacturing 15, p. 319-334.