Author:
Wang Y.,Yan J.,Tseng M.M.
Reference8 articles.
1. Blazewicz J., 2007. Handbook on scheduling. Springer-Verlag. Berlin Heidelberg, Berlin, Heidelberg.
2. Homberger J., 2007. A multi-agent system for the decentralized resource-constrained multi-project scheduling problem. International Transactions in Operational Research, 14(6):565-589.
3. Shen W, Wang L, Hao Q., 2006. Agent-Based Distributed Manufacturing Process Planning and Scheduling: A State-of-the- Art Survey, IEEE Transactions on Systems, Man, and Cybernetics, Part C, 36(4), 563-577.
4. Wang, Y., M.M. Tseng., 2013. A Naïve Bayes approach to Map Customer Requirements to Product Variants. Journal of Intelligent Manufacturing (accepted, DOI 10 1007/s10845-013-0806-2).
5. Wang, Y., M.M. Tseng., 2014. Identifying Emerging Customer. Requirements in Early Design Stage by Applying Bayes Factor Based Sequential Analysis. IEEE Transactions on Engineering Management, 61(1): 129-137.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献