1. A survey of machine scheduling problems with blocking and no-wait in process;Hall;Oper. Res.,1996
2. Flowshop sequencing problems with limited buffer storage;Leistein;International Journal of Production Research,1990
3. C. Smutnicki, Block approach for flow shop scheduling with storage constraints (Polish), Zeszyty Naukowe Politechniki Śla̧skiej, Ser. Automatyka 84 (1986) 223–233
4. C. Smutnicki, A two-machine flow shop scheduling problem with buffers, Technical Report PRE 19/97, Technical University of Wrocław
5. On two-machine scheduling with release and due dates to minimize maximum lateness;Grabowski;Opsearch,1980