Author:
Brucker Peter,Knust Sigrid
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference27 articles.
1. Scheduling project networks with resource constraints and time windows;Bartusch;Annals of Operations Research,1988
2. A new and efficient heuristic for scheduling problems with resource restrictions and multiple execution modes;Boctor;European Journal of Operational Research,1996
3. K. Bouleimen, H. Lecoque, A new efficient simulated annealing algorithm for the resource constrained project scheduling problem and its multiple mode version, Technical Report, University of Liege, 1998
4. Resource-constrained project scheduling: notation, classification, models and methods;Brucker;European Journal of Operational Research,1999
5. A branch and bound algorithm for the resource-constrained project scheduling problem;Brucker;European Journal of Operational Research,1998
Cited by
56 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献