1. Culmo MP. Accelerated bridge construction-experience in design, fabrication and erection of prefabricated bridge elements and systems. Federal Highway Administration Report No. FHWA-HIF-12-013; 2011. 346pp.
2. Marsh ML, Wernli M, Garrett BE, Stanton JF, Eberhard MO, Weinert MD. Application of accelerated bridge construction connections in moderate-to-high seismic regions. Washington, D.C., National Cooperative Highway Research Program (NCHRP) Report No. 698; 2011. 324pp.
3. Seismic performance of precast columns with mechanically spliced column-footing connections;Haber;ACI Struct J,2014
4. Culmo MP. Connection details for prefabricated bridge elements and systems. Federal Highway Administration Report No. FHWA-IF-09-010; 2009. 568pp.
5. Brenes FJ, Wood SL, Kreger ME. Anchorage requirements for grouted vertical-duct connectors in precast bent cap systems. Center for Transportation Research, The University of Texas at Austin, Federal Highway Administration Report No. FHWA/TX-06/0-4176-1; 2006. 251pp.