Abstract
Many kinds of production systems are used in medical equipment industries, one of which is through the work-in-process (WIP) buffer control system and feeding material scenarios to assure ability of the process to produce the expected throughput. The production model, known as the D minus 1 production scenario, is used to control production activities at the factory to be carried out using the day minus 1 rule. This rule is a time-based buffer production scenario in 1 day, ending at the finished goods assembly station used as the zero point (D0), from each workstation, pushed for one consecutive day to the beginning of the buffer. With the success of providing WIP buffers on D-1 and D-2 days, the product is certain to be ready on time. Production activities are modeled as Heaviside step function of the various processes involved therein. Production schedule, also production simulation, can be planned through a production dashboard provided for this purpose. Customers demand transformed to an integrated production schedule throughout the production flow, followed by production dispatching and execution. The integrated production schedule includes the supply of raw components, welding, paint, and product assembly to meet on time deliveries.
Reference28 articles.
1. International Organization for Standardization. Medical Devices – Quality Management System – Requirement for Regulatory Purposes. 2016. (ISO 13485)
2. International Organization for Standardization. Quality Management System - Requirements. 2015. (ISO 9001)
3. International Organization for Standardization. Medical devices - Application of risk management to medical devices. 2007. (ISO 14971)
4. Amasaka K. Evolution of Japanese automobile manufacturing strategy using New JIT: Developing QCD studies employing new SCM model. Journal of Applied Mechanical Engineering. 2016;5(3):1-14. DOI: 10.4172/2168-9873.1000206
5. Amasaka K, New JIT. New management technology principle: Surpassing JIT. Procedia Technology. 2014;16:1135-1145