State of the Art in Float-Overs

Author:

Seij Michel1,de Groot Henk1

Affiliation:

1. Dockwise Shipping

Abstract

Abstract The float-over deck installation is in use as an effective installation method since the eighties. The method has developed and the applicability has widened to heavier integrated decks and harsher environments such as West- Africa and West-Australia. The paper describes the state of the art in float-over deck installations by an overview of a number of typical float-over operations. Each of these float-overs has a typicality related to:Integrated deck weight;Environment;Installation concept. The present state of the art has been reviewed in a SWOT analysis from a contractor's and operator's perspective. Strength, weaknesses, oppurtunities and threats have been summarized to identify a way forward for future developments. Possibilities for the way forward to achieve the following objectives have been outlined in the paper:Improved workability;Reduced jacket slot requirements;Standardization to reduce early commitment requirements. Introduction Installing an integrated deck onto a jacket structure is an operation that has been executed by using semi submersible crane vessels and derrick barges already for many years. Offshore integration costs can be reduced since the integrated deck weight can be over above the capacity of (locally) available crane capacity. The float-over deck installation is proving to be a competitive alternative for such an offshore installation operation. In recent years the concept of float-over deck installation has matured. With the help of a lengthening track record and benefits over lift operations, the float-over deck installation is taken into account as a reliable means of installing the assets. Since the float-over deck installation has been used only for a limited number of projects compared to the lifting operations performed by semi submersible crane vessel, improvements to the concept are still to be expected. Float-over Deck Installation: Sequence For better understanding of the advantages and dis-advantages of the float-over deck installation over semi submersible crane vessels, a brief introduction to the float-over concept is presented. Load-Out The load-out is the starting point of a float-over deck installation. The integrated deck will be build on-shore and needs to be loaded out onto the installation vessel. Load-outs can be performed either by self propelled modular trailers or by the use of skid tracks. Figure 1 presents a skidded load-out of a 15.000 tons module onto self propelled installation vessel Blue Marlin. Figure 1: Skidded load-out of 15.000 tons module (available in full paper) Requirements for the load-out stage are governed by the following parameters:Integrated deck weight;Tidal range;Quayside dimensions. Sea Transportation After completion of the load-out, the integrated deck has to be seafastened on board the installation vessel prior to commencing sea transportation. One aspect of the transport that's always critical for a float-over transport is stability of the vessel.

Publisher

OTC

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3